The project comprised of a full strip out of finishes and the fit out of an existing 3 storey youth hostel in the New Forest.

The works included minor structural alterations, the supply and install of new wall, floor and ceiling finishes and replacement of the existing timber windows with new UPVC windows.

Further works included the formation of a new ground floor bedroom, a new Ensuite to a first floor bedroom and new shower and WC to the ground floor hall.

The M&E services were updated throughout and adapted to provide new fittings throughout.

Project: Cott Lane, Burley, Ringwood, BH24 4BB

Value: £270k

Duration: 11 Weeks

Project Manager: IDC Consult Limited

Architect: Lever Turner & Cowdell

Contract Format: JCT Intermediate Building Contract with Contractors Design 2011 Edition.

Account Manager: Calum McCulloch