Eldon House
- Calum McCulloch
- Apr 1
- 1 min read
April 2025 – Eldon House, London – CAT B refurbishment, Project Completed.

The project was the comprehensive refurbishment of all floors of the building internally and externally.
Internally: Structural Alterations to create an improved flow of space, New WC Fitout at each floor level, Ceilings, Raised Floors, Drylining, Exposed Brickwork, Exposed Period columns and beams, Exposed services fed from new Service Risers, Reception upgraded & / fitted out, with new wall panels, fire place & marble floor finish, Staircase upgrades/fitout, mezzanine floors reworked so connect directly to main office floors, decorations and high-level finishes throughout.
Externally: New rooftop plant, replacement Schuco windows, Cleaning of façade brick & stonework, new glass and steel raked mansard along Wilson St at 6th floor level, all topped off with a new 7th floor pavilion glass/clad extension.
Started April 2023, completed March 2025
Client CLI Dartriver
Project Manager- Capital And Provincial
M&E Consultant- FLATT
Cost Management: Exigere
Architect: Lifschutz Davidson Sandilands
Structural Engineer: HTS