Woodcut Farm, Maidstone
March 2023 – Woodcut Farm, Maidstone – Warehouse Alterations, Project instructed. This project is for the construction of a new meeting room within the warehouse, with bespoke joinery elements of painted hardwood timber, 30 minute fire rated single glazed sash units and oak veneer doorset into a painted frame incorporated. Additionally, the construction of a secure mesh storage area. Started/ Complete March 2023. #micaprojects #expandingbycontracting #construction


5 Savile Row
February 2023 – 5 Savile Row, London – CAT A refurbishment, Project Instructed. We have been instructed to undertake the shell and core works to the shop unit on 5 Savile row. We are undertaking a number of structural alterations and creating new openings in the slab to allow the feature lift installation. New works include a new lift installation, new metal staircase and all below ground drainage, left ready for the tenants fitout contractor. Started February 2023, completio

Eldon House
February 2023 – Eldon House, London – Phase I CAT A refurbishment, Project Complete. The project combined the basement and ground floors into an independent single let office with dedicated access from Wilson Street, with a newly created cycle storage and changing facilities. The façade at Ground floor brought in new Schuco full height glazed frontage allowing light to not only pass through at Ground Floor but through the Lower level also. The Ground and Lower Level office un


103 Charing Cross
January 2023 - 103 Charing Cross – CAT B refurbishment, Project commenced. This project is a CAT B refurbishment of the 1st floor office and WC, to allow the space to be let out. Works include retaining the existing flooring and improving by sanding and sealing as well as decorations throughout. The existing WC will be completely refurbished to provide modern services. Full new M&E building upgrades will be carried out to complete the phase of refurbishment. Starting January


Ascent 4, Farnborough
January 2023 - Ascent 4, Farnborough – CAT B refurbishment, Project complete. This project is a CAT B refurbishment of the existing West wing space of the building, Splitting the large west wing into two smaller units. Works included new dropped feature ceilings and meeting rooms with glazed Crittal style partitioning. The Units have been refurbished to provide a lighter modern theme, with new feature floor finishes, wall finishes, kitchenettes, and full furnishings to one u

Unit 5 & 6, ISLEWORTH
November 2022 – Unit 5 & 6, Isleworth – CAT A refurbishment, Project ongoing CAT A refurbishment of a 2-storey occupied commercial property to provide a single DDA entrance, new lift and staircase extension to the newly created 2nd floor. The building originally provided a front and rear entrance with 2no. staircases. In order to extend its office footprint at 1st and 2nd floor level, the rear staircase was removed and the openings covered. Refurbishment of the now single sta


BLIGHS MEADOW
September 2022 - Blighs Meadow, Sevenoaks. CAT A refurbishment, Project Commenced. Phase II of works to strip out and white box the adjacent retail unit, and provide new staircase route to first floor offices. One of the units is being completed stripped out, to create an additional 50sqm of lettable retail space, all left as a ‘white box’ ready for occupation. The existing staircase is being refurbished to a standard, left ready for future refurbishment prospects. An additio

105 WIGMORE STREET – 7TH FLOOR
July 2022 - 103 Wigmore St, London – CAT A refurbishment, Project complete. This project is a CAT A refurbishment of the existing 7th Floor of the building, to allow a tenant to relocate within the building to occupy the newly refurbished wing. Works include new metal pan ceilings, with MF borders and decorations throughout. The existing WC’s have been completely redesigned and refurbished to provide modern services. Full new M&E building upgrades (including sprinkler modific

103 WIGMORE STREET – 1st FLOOR EAST
February 2022 - 103 Wigmore St, London – CAT A refurbishment, Project complete. This project is a CAT A refurbishment of the existing East wing space of the building to allow the space to be brought back to the market-place. Works include new metal pan ceilings, with MF borders and decorations throughout. The existing WC’s have been completely redesigned and refurbished to provide modern services. The common parts/lift lobbies have been refurbished to provide a lighter modern

103 WIGMORE STREET – 1ST FLOOR WEST
November 2021 - 103 Wigmore St, London – CAT A refurbishment, Project complete. This project is a CAT A refurbishment of the existing West wing space of the building, to allow a tenant to relocate within the building to occupy the newly refurbished wing. Further CAT A refurbishment works will commence to the East wing in due course. Works include new metal pan ceilings, with MF borders and decorations throughout. The existing WC’s have been completely redesigned and refurbish